HYDRO DAM TURBINE

HYDO DAM TURBINE “B” ACCESS IMPROVEMENTS

Contracted by Yukon Energy, the team provided design assistance and construction services for the Hydro Dam Turbine “B” Access Improvements Project. The project consisted of installing a new retaining wall, asphalt parking lot, oil/grit separator, hydrocarbon-contaminated soil removal and treatment, and underground stormwater utilities. This was an environmentally sensitive project, as the foundation of the retaining wall was below the groundwater table, within a fish-bearing water body, and adjacent to the fast-flowing current of the Yukon River. The team utilized indigenous labor and services utilization throughout the project.